BASE STABILIZATION PLANT (WM Series)

Base Stabilization Plant

Linnhoff’s Base Stabilization Plant series has a primary function of producing plant-mixed graded aggregate base for the Base Course of road pavement. In different countries, the terminology used for this base course material varies. Such names include graded stones, wet-mix, Cement Treated Base (CTB), Roller Compacted Concrete (RCC), etc. The material encompasses a continuous dense grading envelope, right down to the fine fraction for its density.

For a proper graded base course material, hoppers receive well-graded crush rock and sand, with a continuous pugmill mixer. The materials are thoroughly mixed and water is introduced at optimum moisture content. At times depending on the material specifications, cement or lime or flyash is also introduced in the mixer.

From the Base Stabilization Plant, these road base materials are then spread by motor grader or paved using asphalt finisher in layers and compacted with rollers. Upon compaction, the road base is then able to be trafficked without noticeable impression by construction equipment. Subsequently, asphalt hotmix is paved on top of the road base.

 

Advantages:

  • Uninterrupted Production
  • Accurate Proportioning
  • Homogeneous Blending

 

Main Components:

Cold Feed Hoppers

Sand and graded aggregates are compartmentalized with side walls in a containerized structure for easy shipment, transportation and installation. Each feeder having shaft mounted gear motor and frequency inverter control with loadcell connection ensures accurate measurement of plant production.

 

Continuous Twin Shaft Pugmill Mixer

Linnhoff’s uncompromising counter-rotating motion of twin mixing shafts with a very rugged mixer construction ensures continuous uninterrupted production of materials. Specially cast paddles arms and tips as well as durable liners are made of Ni-Hard material, a protection against wear. Sturdy drive of Linnhoff’s mixer coupled to the shaft eliminates misalignment and wear under heavy load.

 

Computer Control

Computer controls housed in a control cabin with glass windows for convenient vision of plant surroundings is dustproof, insulated and air-conditioned. User-friendly computerized system shows full graphical plant visualization and is equipped with frequency inverters, Programmable Logic Controller (PLC), Computer CPU, Voltage Stabilizers, etc. 

 

Model WM250 WM400
Capacity* 250 TPH 400 TPH

     *Based on 5% moisture content for South-East Asia countries.

 

 



Intermat Asean, 8 - 10 June 2017, Bangkok, Thailand
Cambodia Construction Summit & Expo 2016, 1 – 3 December 2016, Phnom Penh, Cambodia
Bauma China, 22 – 25 November 2016, Shanghai, China
Philconstruct, 10 – 13 November 2016, Manila, Philippines
Big 5 Konstruksi Indonesia, 9 – 11 November 2016, Jakarta, Indonesia
IQM Conex, 25 – 26 October 2016, Putrajaya, Malaysia
Roads & Rail Infrastructure Summit 2016, 27 – 28 September 2016, Dar es Salaam, Tanzania
Ethio-Con, 21 – 25 September 2016, Addis Ababa, Ethiopia
West Africa Building & Construction, 22 – 24 June 2016, Accra, Ghana
BuildExpo Africa, 4 – 6 June 2016, Nairobi, Kenya
Philconstruct Visayas, 2 – 4 June 2016, Cebu, Philippines
BAUMA, 11 – 17 April 2016, Munich, Germany
Big 5 Saudi, 7 – 10 March 2016, Jeddah, Kingdom of Saudi Arabia
The 3rd Annual Roads & Highways Conference, 7 – 9 March 2016, Kuala Lumpur, Malaysia
CCA Expo, 3 – 5 December 2015, Phnom Penh, Cambodia
Building & Construction, 26 – 28 November 2015, Yangon, Myanmar
IQM Conex, 27 – 28 October 2015, Putrajaya, Malaysia
Uzcomak, 20 – 22 October 2015, Tashkent, Uzbekistan
Philconstruct, 8 – 11 October 2015, Manila, Philippines
Kazcomak, 16 – 18 September 2015, Almaty, Kazakhstan
ConMach, 11 – 14 March 2015, Lagos, Nigeria
Big 5 Saudi, 9 – 12 March 2015, Jeddah, Saudi Arabia
Bauma Conexpo, 15 – 18 December 2014, Delhi, India
AABI National Summit, 5 – 7 December 2014, Solo, Indonesia
Bauma, 25 – 28 November 2014, Shanghai, China
PMV Live, 17 – 20 November 2014, Dubai, United Arab Emirates
Saudi Build, 10 – 13 November 2014, Riyadh, Kingdom of Saudi Arabia
Philconstruct, 5 – 8 November 2014, Manila, Philippines
Construction, Power, and Mining, 30 Oct – 1 Nov 2014, Yangon, Myanmar
IQM Conex, 14 – 15 October 2014, Putra Jaya, Malaysia
ROAD, 13 – 15 October 2014, Moscow, Russia
CamBuild, 10 – 12 September 2014, Phnom Penh, Cambodia
BuildExpo Africa, 2 – 4 May 2014, Nairobi, Kenya
isologo